Great Lakes Information Network

GLIN==> Disregard Prior E-Mail: Army Corps of Engineers and Asian Carp Director media availability (UNCLASSIFIED)

Gross, Sarah LRC Sarah.D.Gross at usace.army.mil

Tue Feb 1 13:50:37 EST 2011

Classification: UNCLASSIFIED
Caveats: NONE

Army Corps of Engineers and Asian Carp Director media availability- Correct
Information Below 

Who
The Office of the Asian Carp Director, White House Council on Environmental
Quality; Maj. Gen. John Peabody, commander of the U.S. Army Corps of
Engineers, Great Lakes and Ohio River Division; and Col. Vincent Quarles,
commander of the U.S. Army Corps of Engineers, Chicago District.  

What
Media availability before the public scoping meeting for the Great Lakes and
Mississippi River Interbasin Study (GLMRIS). Due to the structure of the
formal public meeting, there will be limited opportunity for media to engage
the key agency representatives until the meeting concludes.

Media is encouraged to take advantage of the opportunity for one-on-one
interviews with the key agency representatives prior to official start of the
2:00 p.m. meeting. 

When
Tuesday, March 8, 2011 from 1:15 p.m. to 1:45 p.m.

Where
Ann Arbor Marriott Ypsilanti at Eagle Crest, located at 1275 S. Huron St.,
Ypsilanti, MI. 

Why
The purpose of GLMRIS is to evaluate a range of options and technologies to
prevent the transfer of aquatic nuisance species (ANS) between the Great
Lakes and Mississippi River through aquatic pathways.

Issues associated with GLMRIS are likely to include, but will not be limited
to: significant natural resources, such as ecosystems and threatened and
endangered species; commercial and recreational fisheries; recreational uses
of the lakes and waterways; effects of potential ANS controls on waterways
uses such as: flood risk management, commercial and recreational navigation;
and statutory and legal responsibilities relative to the effected waterways. 

Using input obtained during the scoping period, the Corps will refine the
scope of GLMRIS to focus on significant issues, as well as eliminate issues
that are not significant from further detailed study.

The public scoping comment period will end on March 31, 2011. For more
information regarding GLMRIS, the meeting agenda and scoping requirements of
the National Environmental Policy Act, visit the GLMRIS Web site at
www.glmris.anl.gov or call Dave Wethington, GLMRIS project manager, at
312-846-5522 or e-mail at David.M.Wethington at usace.army.mil. Social Media:
Facebook.com/glmris and Twitter @GLMRIS.



Classification: UNCLASSIFIED
Caveats: NONE







News | Calendar | Great Links | SOTM | E-Lists | Info Center | About GLIN
The Great Lakes | Environment | Economy | Education | Maps and GIS | Tourism

 

Great Lakes Information Network
Maintained by: Christine Manninen, manninen@glc.org
Selected Photos: Copyright ©John and Ann Mahan
Contact Us | Search | Site Index
© 1993-2008