Great Lakes Information Network

GLIN==> Tomorrow: Army Corps of Engineers and Asian Carp Director Media Availability Prior to Public Meeting (UNCLASSIFIED)

Gross, Sarah LRC Sarah.D.Gross at usace.army.mil

Mon Mar 7 15:39:34 EST 2011

Classification: UNCLASSIFIED
Caveats: NONE

Army Corps of Engineers and Asian Carp Director Media Availability

Who
Asian Carp Director John Goss, White House Council on Environmental Quality
and Maj. Gen. John Peabody, commander of the U.S. Army Corps of Engineers,
Great Lakes and Ohio River Division 

What
Media availability before the first public scoping meeting for the Great
Lakes and Mississippi River Interbasin Study (GLMRIS). Due to the structure
of the formal public meeting, there will be limited opportunity for media to
engage the key agency representatives until the meeting concludes.

Media is encouraged to take advantage of the opportunity for one-on-one
interviews with the key agency representatives prior to official start of the
2:00 p.m. meeting. Identical presentations about the study will be given at
2:00 p.m. and 5:30 p.m., each followed by the comment period.  

When
Tuesday, March 8, 2011 from 1:15 p.m. to 1:45 p.m.

Where
Ann Arbor Marriott Ypsilanti at Eagle Crest, located at 1275 S. Huron St.,
Ypsilanti, MI. 

Why
The purpose of GLMRIS is to evaluate a range of options and technologies to
prevent the transfer of aquatic nuisance species (ANS), such as Asian carp,
between the Great Lakes and Mississippi River through aquatic pathways.

Issues associated with GLMRIS are likely to include, but will not be limited
to: significant natural resources, such as ecosystems and threatened and
endangered species; commercial and recreational fisheries; recreational uses
of the lakes and waterways; effects of potential ANS controls on waterways
uses such as: flood risk management, commercial and recreational navigation;
and statutory and legal responsibilities relative to the effected waterways. 

Using input obtained during the scoping period, USACE will refine the scope
of GLMRIS to focus on significant issues, as well as eliminate issues that
are not significant from further detailed study.

The public scoping comment period will end on March 31, 2011. For more
information regarding GLMRIS, the meeting agenda and scoping requirements of
the National Environmental Policy Act, visit the GLMRIS Web site at
www.glmris.anl.gov or call Dave Wethington, GLMRIS project manager, at
312-846-5522 or e-mail at David.M.Wethington at usace.army.mil. Join the
conversation at Facebook.com/glmris and Twitter @ GLMRIS. 




Classification: UNCLASSIFIED
Caveats: NONE







News | Calendar | Great Links | SOTM | E-Lists | Info Center | About GLIN
The Great Lakes | Environment | Economy | Education | Maps and GIS | Tourism

 

Great Lakes Information Network
Maintained by: Christine Manninen, manninen@glc.org
Selected Photos: Copyright ©John and Ann Mahan
Contact Us | Search | Site Index
© 1993-2008